1. Trespass--failure to show affirmative defense-_negligence--easement by necessity--
easement implied from prior use
The trial court did not err by finding that plaintiff established a prima facie case of
defendant's trespass for damage caused by the break in a stub-out on plaintiff's property from a
water pipe serving defendant's property and that defendant failed to establish that it had any
affirmative defense to the trespass, because: (1) there was sufficient evidence to support the trial
court's finding that defendant owned the water that ran through the water pipe and subsequently
flooded plaintiff's property thus causing damage to plaintiff's property; (2) although defendant
argues on appeal that plaintiff negligently caused the release of water onto plaintiff's property
and that defendant did not intentionally cause the water to enter onto plaintiff's property, at no
point in the pleadings did defendant plead plaintiff's negligence as an affirmative defense nor did
the trial court make any finding of fact regarding plaintiff's alleged negligence; (3) defendant
failed to establish the affirmative defense of easement by necessity since the trial court's findings
of fact properly supported the court's conclusions of law that it was not necessary that the pipe or
stub-out be located on plaintiff's property in order for defendant to use and enjoy its property;
and (4) defendant failed to establish the affirmative defense of easement implied from prior use
when defendant did not to meet the required test of permanency.
2. Damages and Remedies--reasonableness--trespass
The trial court did not err in a trespass case by awarding plaintiff $122,918.80 for damage
caused by the break in a water pipe, because plaintiffs presented sufficient evidence to allow the
trial court to calculate the damages to a reasonable degree of certainty.
3. Appeal and Error--cross-assignment of error--unnecessary to reach issue
Although plaintiff has cross-assigned error to the trial court's findings of fact in a trespass
case that the pipe was owned by plaintiff and that the pipe originally was installed on plaintiff's
property prior to the severance of title, it is unnecessary to reach this cross-assignment of error
because the Court of Appeals already affirmed the trial court's finding that plaintiff established a
prima facie case of defendant's trespass and that defendant failed to establish any affirmative
defense.
4. Appeal and Error--cross-assignment of error--cross appeal
Although plaintiff has cross-assigned error that there was insufficient evidence to support
the trial court's reduction in plaintiff's damages in a trespass case, this cross-assignment of error
is dismissed because it is not an alternative basis in law for supporting the judgment, but instead
constitutes an attack on the judgment itself. The correct method for plaintiff to have raised this
question on appeal was to have raised the issue on cross appeal.
Isaacson, Isaacson & Sheridan, LLP, by Jennifer N. Fountain,
and Forman Rossabi Black, PA, by Amiel J. Rossabi, for
plaintiff-appellee.
Smith Moore, LLP, by Stephen P. Millikin and Lisa Kaminski
Shortt, for defendant-appellant.
JACKSON, Judge.
CDC Pineville, LLC (plaintiff) is the owner of a tract of
land located on Old Pineville Road in Pineville, North Carolina.
UDRT of North Carolina, LLC (defendant) is the owner of a tract
of land located at 5221 Cherrycrest Lane in Pineville, North
Carolina. Plaintiff and defendant's tracts are adjacent to one
another, and both tracts previously were owned by a common grantor,
Korbler Development Corporation (Korbler).
The Korbler family owned a large tract of land, out of which
both parties' tracts eventually were severed. The Korbler family
and other partners formed Korbler Development Corporation and Hill
Haven Developers (Hill Haven) to build a large apartment complex
in five phases on the land owned by the Korbler family. In
preparing the construction plans, the developer attempted to
structure Phase I such that the next phase would tie conveniently
into it. After the apartments were completed on Phase I of the
construction project, Korbler and Hill Haven abandoned further
development plans due to financial difficulties. In December 1974, Korbler deeded the portion of land which
included the apartments to Hill Haven which later deeded the
property to defendant. In January 1975, Korbler deeded a separate
parcel of the land to Suitt Construction Company (Suitt), which
is not a party to this action. The remaining parcel of Korbler's
land, with the exception of a small portion not at issue in this
matter, was acquired in May 1981 at a foreclosure sale, by two
partners from Hill Haven. The partners subsequently deeded this
remaining parcel to plaintiff.
In October 2000, plaintiff was developing its land for an
apartment complex. During the process of grading a portion of the
land adjacent to defendant's property, a construction crew employed
by plaintiff broke a stub-out from a water pipe serving defendant's
property, thereby causing defendant's apartment complex to lose
water pressure and supply. The water pipe extended from
defendant's property, onto plaintiff's property by way of the stub-
out. The construction crew was in the process of grading the land
for a private street, and was working solely on plaintiff's
property when it struck the pipe. Water flowing from the broken
pipe caused damage to the street compaction, sedimentation pond,
wetlands, and caused silt to collect in pipes that had been
installed for plaintiff's property.
On 6 September 2001, plaintiff filed a complaint against
defendant in Guilford County Superior Court. Plaintiff alleged
that defendant trespassed onto plaintiff's property when it
allowed: (1) a concealed water pipe on plaintiff's property withoutplaintiff's permission; (2) the water pipe to flood plaintiff's
property; and (3) the water pipe to remain on plaintiff's property
without plaintiff's permission. Plaintiff also alleged that
defendant was negligent in that defendant had a duty to remain
within its own property lines, to ensure that its facilities did
not encroach on neighboring property, it breached that duty by
allowing the water pipe to exist on plaintiff's property and to
flood plaintiff's property, and that the damage from the flooding
to plaintiff's property was in excess of $10,0000.00. In its
answer, defendant pled the affirmative defenses that, in the water
pipe, it had implied easements by necessity and from prior use.
On 2 July 2002, the trial court granted defendant's motion for
directed verdict on plaintiff's claim for negligence, but denied
its motion for directed verdict for plaintiff's trespass claim.
The trial court ordered defendant to pay plaintiff one hundred
twenty-two thousand, nine hundred and eighteen dollars and eighty
cents ($122,918.80) plus court costs and interest. In its order,
the trial court's conclusions of law stated:
(2) The use of the water pipe by the grantor,
Korbler Development Corporation, prior to
the separation of title . . . was not of
sufficient duration to show that the
easement was so long continued and
obviously manifest to show it was
intended to be permanent despite evidence
that the grantor's usage was obvious and
manifest. As a result, Defendant did not
meet the test for permanency required for
an easement from prior use.
(3) The common grantor of Defendant and
Plaintiff did not intend to use one
portion of its tract for the benefit of
the other.
(4) The claimed easement by Defendant was not
necessary to the use and enjoyment of
Defendant's property.
(5) Defendant did not have the benefit of an
implied easement from prior use.
(6) The common grantor, Korbler Development
Corporation, did not intend that grantee,
Hill Haven Developers, should have right
of access onto Plaintiff's property.
(7) Neither Korbler Development Corporation
nor Hill Haven Developers intended the
Defendant's pipe to be in the location
where it was found. Therefore, the
requisite intent for an implied easement
by necessity was not shown by Defendant.
It was not necessary for the stub and the
pipe located on Plaintiff's property to
be there in order for Defendant to use
and enjoy Defendant's property. . . .
(8) Defendant did not have the benefit of an
implied easement by necessity when the
entry onto Plaintiff's property occurred.
(9) In that Plaintiff established its prima
facie case on trespass and Defendant
failed to establish any affirmative
defense (including any easement to enter
upon Plaintiff's property), Defendant is
liable to Plaintiff in trespass.
Defendant appealed the trial court's July 2002 order. On 16
December 2003, this Court remanded the case back to the trial court
for further findings of fact and conclusions of law, holding that:
These findings of fact appear to indicate that
the pipes were located on property owned by
CDC and conveyed by the common grantor,
Korbler. Moreover, the findings indicate CDC
stipulated to ownership of the land. However,
the findings fail to establish when the pipes
were placed on CDC's land. Indeed, the record
shows that before the conveyances by Korbler,
the apartments currently owned by UDRT were in
operation and water flowed to the tenants.
Thereafter, Korbler conveyed the adjoiningproperty to CDC. When the pipe was damaged by
CDC's contractors, the apartments lost water
pressure and supply. Upon investigation, it
was determined CDC's contractors damaged a
stub-out which lay underneath a gas line, also
damaged by the contractor. The gas line,
phone line, and water system ran underneath a
paved road and served UDRT's property. This
evidence suggests that the pipe was installed
by the common grantor, Korbler, before the
properties were separately conveyed to CDC and
UDRT property. Although CDC argues that UDRT
did not meet its burden in demonstrating the
pipes were in place before the initial 1974
conveyance, the burden was upon CDC to
establish each element of trespass in order to
shift the burden to UDRT to present an
affirmative defense. . . . [T]he record
appears to indicate that CDC owned some of the
land in which the water pipes were installed
prior to the initial conveyance. However, the
findings of fact fail to indicate whether the
trial court evaluated this evidence nor are
there findings of fact regarding the current
ownership of the property as it relates to how
it was developed in the early 1970s when the
pipes were installed. The significance of
additional findings on this issue would shed
light on the issue of whether the location of
the pipe when it was damaged was the same as
it was when the property was commonly owned.
If so, then the common grantor would have
conveyed ownership of that part of the pipe
located on CDC's property to CDC, not UDRT.
It would therefore follow that if CDC owned
the part of the pipe that it damaged on its
property, it could not recover damages based
upon a trespass claim. . . . Hence, the
findings are inadequate to determine whether
UDRT owned the water that damaged CDC's
property.
CDC Pineville, LLC v. UDRT of North Carolina, LLC, 161 N.C. App.
741, __, 590 S.E.2d 23, __ (2003) (unpublished opinion, per N.C. R.
App. P. 30(e)) (CDC Pineville I).
Following argument in chambers on 14 January and 3 August
2004, the trial court made additional findings of fact andconclusions of law. A supplemental judgment and order was filed on
14 September 2004. The supplemental judgment and order restated
and amended specific findings and conclusions of law from the
original July 2002 order, and also made additional findings of fact
and conclusions of law which supplemented the findings and
conclusions of the original order. All findings of fact and
conclusions of law from the original order that were not amended by
the supplemental judgment and order remained in full force and
effect. Defendant now appeals from this judgment.
[1] Defendant contends that the trial court erred in finding
that plaintiff proved its prima facie case of trespass.
Specifically, defendant asserts that it took no action to cause the
water to flow onto plaintiff's property, and that the pipe was
owned and controlled at all times by plaintiff. Further, defendant
argues that plaintiff, by its own negligence, caused the water to
divert from its normal path resulting in damage to its property.
In order to establish a trespass to real property, a
plaintiff must show: (1) his possession of the property at the time
the trespass was committed; (2) an unauthorized entry by the
defendant; and (3) resulting damage to the plaintiff. Shadow
Grp., LLC v. Heather Hills Home Owners Ass'n, 156 N.C. App. 197,
201, 579 S.E.2d 285, 287 (2003). Further, without a showing of
negligence, trespass to land requires an intentional entry onto
the land of another. Industrial Center v. Liability Co., 271 N.C.
158, 163, 155 S.E.2d 501, 506 (1967). In the instant case, neither
party disputes the fact that damage was done to plaintiff'sproperty as a result of the break in the water pipe. Further,
neither party disputes the fact that the water pipe ran from the
water meter at the northern edge of defendant's property, across
defendant's property, and that the stub-out crossed defendant's
property line onto plaintiff's property, where it then extended
onto plaintiff's property.
A trial court's findings of fact are binding on appeal,
provided they are supported by any competent evidence in the
record. Patterson v. Taylor, 140 N.C. App. 91, 95, 535 S.E.2d
374, 377 (2000). Where no exceptions have been taken to the
findings of fact, such findings are presumed to be supported by
competent evidence and are binding on appeal. Schloss v. Jamison,
258 N.C. 271, 275, 128 S.E.2d 590, 593 (1962); see also, Koufman v.
Koufman, 330 N.C. 93, 97, 408 S.E.2d 729, 731 (1991). However, a
trial court's conclusions of law are fully reviewable on appeal.
State v. Barber, 335 N.C. 120, 436 S.E.2d 106 (1993), cert. denied,
512 U.S. 1239, 129 L. Ed. 2d 865 (1994).
It is undisputed that plaintiff owned the land at the time and
place where the pipe was damaged. The trial court found as fact
that [t]he water flowing through the damaged water pipe was owned
by Defendant at the time of the break. This finding was
uncontested on appeal by either party, and thus is binding on the
court. The trial court further found that:
2. Water flowed from Defendant's property,
through Plaintiff's pipe and onto
Plaintiff's property, causing damage to
Plaintiff's property. Plaintiff did not
authorize Defendant's entry ontoPlaintiff's property. (Restated original
finding of fact 13)
. . . .
4. Only that portion of the water pipe which
was located on Plaintiff's property as
found in 2000 was owned by Plaintiff.
(Supplemental finding of fact 4)
. . . .
14. Once the water passes through the water
meter located at the northern end of
Defendant's property, Defendant becomes
the owner of the water that comes onto
and services its property. (Supplemental
finding of fact 14)
Of the above findings of fact, only supplemental finding of fact
four is uncontested, and thus binding on appeal. Plaintiff
contests restated finding of fact number two, in that the court
found that it owned the pipe, and defendant contests supplemental
finding number fourteen, in that the court found that defendant
owned the water that passed through its water meter. The trial
court was presented with testimony that defendant owned the water
pipe that extended from its water meter onto its property, and that
once water passes through a water meter that measures the amount of
water for which the owner will be billed, the owner of the pipe
beyond the meter then becomes owner of the water. Testimony
presented also showed that at the time of the break in the pipe,
defendant had to turn off the water in order to stop the flooding
onto plaintiff's property, thereby evidencing that defendant
ultimately had control over the water. Based on the testimony
presented at trial, we hold there was sufficient evidence to
support the trial court's finding that defendant owned the waterthat ran through the water pipe and subsequently flooded
plaintiff's property, thereby causing damage to plaintiff's
property.
Neither party disputes the fact that plaintiff did not
authorize defendant to enter onto plaintiff's property. Defendant
argues on appeal that plaintiff negligently caused the release of
water onto plaintiff's property, and that defendant did not
intentionally cause the water to enter onto plaintiff's property.
However, at no point in the pleadings did defendant plead
plaintiff's negligence as an affirmative defense, nor did the trial
court make any finding of fact regarding plaintiff's alleged
negligence. Thus, we cannot find defendant's argument on this
issue to be meritorious, and we hold there was sufficient evidence
presented at trial to support the trial court's conclusion that
plaintiff had established a prima facie case of defendant's
trespass.
As an affirmative defense to trespass, a defendant may assert
that its entry onto plaintiff's land was lawful or under legal
right. Singleton v. Haywood Elec. Membership Corp., 357 N.C. 623,
628, 588 S.E.2d 871, 874 (2003) (citing Hildebrand v. Telegraph
Co., 216 N.C. 235, 236, 4 S.E.2d 439, 439 (1939)). In the instant
case, the trial court concluded as a matter of law that defendant
failed to establish that the existence of the pipe on plaintiff's
property constituted an implied easement by prior use or necessity,
and thus defendant had failed to establish any affirmative defense
to plaintiff's claim of trespass. Defendant contends the trial court erred in finding that it
did not have an easement by necessity. Defendant specifically
argues that the property was owned and conveyed by a common
grantor, the easement in land in which the water pipe was laid
became necessary upon separation of title, and when the pipe was
installed, Korbler intended that Hill Haven have the right of
access.
In order to establish an easement by necessity, one must show
that: (1) the claimed dominant parcel and the claimed servient
parcel were held in a common ownership which was ended by a
transfer of part of the land; and (2) as a result of the land
transfer, it became 'necessary' for the claimant to have the
easement. Wiggins v. Short, 122 N.C. App. 322, 331, 469 S.E.2d
571, 577-78 (1996) (citing Harris v. Greco, 69 N.C. App. 739, 745,
318 S.E.2d 335, 339 (1984)). One need not show absolute necessity,
only physical conditions and use which would 'reasonably lead one
to believe that the grantor intended the grantee should have the
right of access.' Id. at 331, 469 S.E.2d at 578 (citations
omitted). The right to use the easement must be necessary to the
beneficial use of the land granted, 'and to its convenient and
comfortable enjoyment, as it existed at the time of the grant.'
Id. (citation omitted). If an easement by necessity is to be
created, it will be created, if at all, upon conveyance from the
common ownership. Boggess v. Spencer, 173 N.C. App. 614, 619, 620
S.E.2d 10, __ (2005) (citing Broyhill v. Coppage, 79 N.C. App. 221,
226, 339 S.E.2d 32, 37 (1986)). In this case, the trial court found as fact, which neither
party contested, that neither Korbler, nor Hill Haven ever intended
for the pipe to be located on the tract which later became
plaintiff's property. Further, the trial court found, and the
testimony presented at trial tended to show, that no one involved
in any of the construction projects or conveyances had any
knowledge that the pipe had been installed south of the boundary
line for Phase I, which later became the property boundary between
the parties' properties. Testimony from William Korbler, former
secretary of Korbler Development Corporation, indicated that the
water pipe was installed to service Phase I of their project, and
that Korbler Development Corporation hoped to be able to tie into
that water pipe as they developed future phases of their project.
The future phases were to be constructed on other portions of
Korbler's land. He also testified that at no time during the
construction on Phase I, when the pipe was installed, was there any
construction or work done on the property which later became
plaintiff's property.
The trial court concluded as a matter of law, that Korbler,
the common grantor, never intended to use one part of its property
for the benefit of another. Accordingly, we hold there was
sufficient evidence presented at trial to support the trial court's
findings that the parties involved in the construction of Phase I
and the subsequent conveyances believed that the pipe had been
installed completely on defendant's property, and that although
Korbler may have intended to tie into the water pipe in thefuture, there was insufficient evidence to show that it intended to
use the Phase I property to benefit its other tracts of land.
The trial court also found that defendant's source of water
originated at the northern edge of its property, opposite of its
southern boundary with plaintiff's property. Thus it was not
necessary that defendant's water pipe be located on plaintiff's
property in order for defendant's property to have access to water.
In addition, testimony presented at trial showed that following the
break in the water pipe, defendant paid a utility contractor to
move the water pipe so that it existed solely on defendant's
property. This testimony weighs heavily on the issue of whether or
not it was necessary that the pipe be located on plaintiff's
property such that defendant could make beneficial use of its land.
The trial court's findings of fact properly support the court's
conclusions of law that it was not necessary that the pipe or stub-
out be located on plaintiff's property in order for defendant to
use and enjoy its property, thus there was no easement by
necessity. Therefore, we hold the trial court did not err in
concluding that defendant failed to establish that it had an
affirmative defense of easement by necessity.
Defendant next asserts that the trial court erred in
determining that it did not have an implied easement from prior
use.
To have established an implied easement by prior use,
defendant was required to prove that:
(1) there was a common ownership of the
dominant and servient parcels of land and asubsequent transfer separated that ownership,
(2) before the transfer, the owner used part
of the tract for the benefit of the other
part, and that this use was apparent,
continuous and permanent, and (3) the claimed
easement is necessary to the use and
enjoyment of plaintiffs' land.
Metts v. Turner, 149 N.C. App. 844, 849, 561 S.E.2d 345, 348 (2002)
(citing Knott v. Washington Hous. Auth., 70 N.C. App. 95, 98, 318
S.E.2d 861, 863 (1984)). [A]n 'easement from prior use' may be
implied 'to protect the probable expectations of the grantor and
grantee that an existing use of part of the land would continue
after the transfer.' Knott, 70 N.C. App. at 97-98, 318 S.E.2d at
863 (citation omitted). Thus, defendant had to show that the use
of the purported easement existed prior to the severance of title
by Korbler, and that at the time of the severance, Korbler intended
that the use would continue. The use of the easement must be so
. . . long continued as to show it was meant to be permanent.
Tower Dev. Partners v. Zell, 120 N.C. App. 136, 144, 461 S.E.2d 17,
23 (1995) (citation omitted) (holding eighteen months is
insufficient to establish an easement by prior use). A review of
our State's caselaw indicates the shortest time heretofore
recognized as sufficient to imply an easement is thirteen years.
Id. (citing Potter v. Potter, 251 N.C. 760, 112 S.E.2d 569 (1960)).
The majority of cases finding an easement by prior use were cases
with a use in excess of 30 years. Id.; see, e.g., Spruill v.
Nixon, 238 N.C. 523, 78 S.E.2d 323 (1953) (at least 35 years);
Biggers v. Evangelist, 71 N.C. App. 35, 321 S.E.2d 524 (1984),
disc. review denied, 313 N.C. 327, 329 S.E.2d 384 (1985) (30years); McGee v. McGee, 32 N.C. App. 726, 233 S.E.2d 675 (1977) (60
years); Dorman v. Ranch, Inc., 6 N.C. App. 497, 170 S.E.2d 509
(1969) (42 years).
As found by the trial court, and supported by testimony
presented at trial, the water pipe was installed during the
construction of Phase I, which ended in 1973. Korbler then
conveyed the Phase I property to Hill Haven in 1974, it conveyed a
separate tract of its land in 1975, and the remaining property,
which is now plaintiff's property, was lost in a foreclosure sale
in 1981. Although Korbler intended the water pipe to be permanent
at the time it was installed, there was no evidence presented
indicating that Korbler Development Corporation intended that the
grantees of its other tracts of land would be permitted to utilize
the water pipe and stub-out that existed on plaintiff's property.
There was testimony and evidence presented that when Korbler
conveyed the tract to Suitt in 1975, it also conveyed an easement
to allow Suitt to tie into the Phase I water and sewer lines, but
not at the stub-out and water pipe which later was found on
plaintiff's property. In addition, the use of the water pipe by
Korbler was not of sufficient duration prior to severance of title
to comport with our caselaw giving rise to an easement by prior
use.
Therefore, we hold the trial court's findings of fact were
supported by competent evidence, and thus supported the court's
conclusions of law finding that defendant failed to meet the test
for permanency as required to establish an easement by prior use. The court therefore acted properly in finding that defendant failed
to establish the affirmative defense of easement by prior use.
[2] Defendant further contends the trial court erred by
awarding plaintiff $122,918.80 for damage caused by the break in
the water pipe. Defendant specifically argues that the evidence of
the damages, the bills presented as evidence at trial, consisted of
nothing more than a mere recitation by plaintiff of its damages.
A plaintiff has the burden of proving the amount of the loss
with reasonable certainty. Erler v. Aon Risks Servs., Inc., 141
N.C. App. 312, 319, 540 S.E.2d 65, 70 (2000) (quoting Phillips v.
Insurance Co., 43 N.C. App. 56, 58, 257 S.E.2d 671, 673 (1979)).
A plaintiff must present data showing a basis for the
reasonableness of the loss amount, however proof to an absolute
mathematical certainty is not required. State Properties, LLC v.
Ray, 155 N.C. App. 65, 76, 574 S.E.2d 180, 188 (2002), disc. review
denied, 356 N.C. 694, 577 S.E.2d 889 (2003). If there is a
question regarding the reliability of the evidence presented to
support an award of damages, the questions should go to the weight
of the evidence, and generally should not be grounds for exclusion
of the evidence. Beroth Oil Co. v. Whiteheart, 173 N.C. App. 89,
95, 618 S.E.2d 739, 744 (2005) (citing State Properties, LLC, 155
N.C. App. at 76, 574 S.E.2d at 188).
Here, plaintiff presented evidence that D&M Builders was
employed by plaintiff to construct the apartment buildings on
plaintiff's land. D&M Builders was hired not only to perform the
construction, but also to oversee and manage all aspects of theproject. Plaintiff presented documentary evidence of all of the
bills plaintiff and D&M Builders received for work done in order to
repair the damage caused by the break in the water pipe. After the
break in the pipe, D&M created a specific code in its billing
system so that it could track all of the work related to repairing
the damage caused by the water. The superintendent of the
plaintiff's project, an employee of D&M, testified that the water
that came from the broken pipe caused serious erosion to the
already compacted construction site and to the area that had been
prepared for a road, and that it caused serious flooding and damage
to the sedimentation pond and the wetlands that abutted plaintiff's
property. At the time of the trial, plaintiffs and D&M Builders
still were incurring fines and expenses as a result of continuing
damage to the wetlands, caused by the flooding. Testimony also
showed that the entire construction project was delayed for nearly
thirty days, in order to repair the erosion, remove the silt from
pipes installed on plaintiff's property, and repair other aspects
of the project.
Testimony showed that all bills which were addressed to D&M
Builders, as managers of the project, were paid by D&M Builders,
and then plaintiff reimbursed D&M Builders. Both the
superintendent from D&M Builders and one of plaintiff's managing
members, testified that they witnessed the work being done, all of
the bills presented as evidence had been paid in the ordinary
course of business, all of the work done and amounts paid were
reasonable, and the expenses were incurred as a result ofdefendant's water flooding onto plaintiff's property. Defendant
objected to the admission of the bills into evidence, but did not
produce any evidence to dispute the amount of the charges or that
they actually were paid. Therefore, we conclude that plaintiffs
presented sufficient evidence to allow the trial court to calculate
the damages to a reasonable certainty, thus supporting the trial
court's findings and award of $122,918.80 in damages to plaintiff.
[3] Plaintiff has cross-assigned error to the trial court's
findings of fact that the pipe was owned by plaintiff, and that the
pipe originally was installed on plaintiff's property prior to the
severance of title. Plaintiff argues that no competent evidence
was presented at trial to support these findings.
Rule 10(d) of the North Carolina Rules of Appellate Procedure
provides that an appellee may cross-assign as error any action or
omission of the trial court which . . . deprived the appellee of an
alternative basis in law for supporting the judgment, order, or
other determination from which appeal has been taken. N.C. R.
App. P. 10(d) (2005). As we have found no error in the trial
court's finding that plaintiff established a prima facie case of
defendant's trespass, for which defendant failed to establish any
affirmative defense, it is unnecessary to reach plaintiff's
cross-assignments of error regarding the trial court's findings
that at the time of the break plaintiff owned the portion of the
pipe on its property, or that the pipe was installed on plaintiff's
property prior to the severance of title. [4] As plaintiff's final cross-assignment of error, plaintiff
argues that there was not sufficient evidence to support the trial
court's reduction in plaintiff's damages. As previously stated,
cross-assignments of error must be limited to an alternative basis
in law for supporting the judgment. Plaintiff's cross-assignment
of error regarding the damages award is not an alternative basis,
but rather constitutes an attack on the judgment itself.
Plaintiff's arguments concerning the damages award attempt to show
how the trial court erred in its findings of fact and conclusions
of law, and do not provide an alternate basis for supporting the
court's award of damages. The correct method for plaintiff to have
raised this question on appeal was to have raised the issue on
cross appeal. Wilson Realty & Constr., Inc. v. Asheboro-Randolph
Bd. of Realtors, 134 N.C. App. 468, 473, 518 S.E.2d 28, 32 (1999);
Cox v. Robert C. Rhein Interest, Inc., 100 N.C. App. 584, 588, 397
S.E.2d 358, 361 (1990). Plaintiff failed to properly cross-appeal
and thus waived this Court's consideration of the issue on appeal.
Williams v. N.C. Dep't of Env't and Natural Res., 166 N.C. App. 86,
95, 601 S.E.2d 231, 236 (2004); Lewis v. Edwards, 147 N.C. App. 39,
51-52, 554 S.E.2d 17, 24-25 (2001). Therefore, we dismiss
plaintiff's final cross-assignment of error.
We therefore hold the trial court properly found that
plaintiff established a prima facie case of defendant's trespass,
and that defendant failed to establish that it had any affirmative
defense to the trespass. We also hold the trial court's award of
damages to plaintiff was proper. Affirmed.
Judges HUDSON and STEELMAN concur.
*** Converted from WordPerfect ***